-
Electricity: the participation fee includes the basic power voltage of 110V/ 500W, and does not include 220V power.
-
Each booth contains the structure decoration and basic equipment. Exhibitors are not allowed to change the decoration configuration on their own. If the exhibitor wishes to change the booth decoration due to the product display, the design drawing must be submitted to the organizer to review beforehand. After the design is approved by the organizer, then and only then the construction can begin.
-
It is strictly forbidden to close the panelboard, fire-fighting equipment, emergency door, air quality detector and any form of signs. Fire-fighting equipment, air quality detectors and emergency doors must not have any decoration or booth exhibits placed in front as it is considered a safety hazard. Any decoration placed in undesignated areas is considered a violation and the responsible parties may be penalized. The goods, materials or exhibits that block the front of the passenger or freight elevators and their passages will also be considered a violation and will need to be removed immediately. If not changed after receiving a notice, then the exhibition organizer will forcefully remove them. The removal costs will be borne by the responsible exhibitors.
Shell Scheme Booth Basic Equipment List |
1x Carpet (cannot request color) |
1x Locker |
1x Company signboard |
1x High table |
2x Chair |
4x Spot Light (100W) |
1x Electric outlet (110V, 5A) |
1x Trash Can |
Notice: the organizers reserve the right to amend the design of the booth. The final design will be announced during the pre-show briefing.